Obstruction of construction of authorised works
article 33 of The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020
- Status not determined
- Strict liability
- Summary only
- Transport: maritime, aviation, rail and harbours
This offence was read from the text as made, and no revised version was available, so a later revocation could not be ruled out. Check the current text at legislation.gov.uk.
What the provision says
33 Any person who, without reasonable excuse—
a obstructs any person acting under the authority of Network Rail in setting out the lines of the scheduled works or in constructing any authorised work; or
b interferes with, moves or removes any apparatus belonging to any person acting under the authority of Network Rail, is guilty of an offence and liable on summary conviction to
a fine not exceeding level
3 on the standard scale.
Text as made, from legislation.gov.uk. © Crown copyright, reused under the Open Government Licence v3.0. This is the text as originally made; later amendments are not shown here.
Who it binds, and what has to be proved
- Binds
- a person
- Conduct
- obstructing an official exercising a power
- Fault element
- Strict liability
- Burden of proof
- An element of the offence, for the prosecution to prove
The prosecution must prove that the conduct happened. This is a strict liability offence as drafted: the provision uses no word of intention, knowledge, recklessness or negligence, so there is no need to show that a person meant to do it, knew about it, or was careless.
Intention, knowledge and carelessness are irrelevant to guilt. They may still matter a great deal to sentence.
“Without reasonable excuse” here is an element of the offence rather than a defence, so its absence is for the prosecution to prove (R v Charles [2009] EWCA Crim 1570).
Classifier’s reasoning: no word of intention, knowledge, recklessness or negligence in the offence or its provision; qualified by reasonable excuse (an element; prosecution disproves once raised).
The defence, as drafted
33 Any person who, without reasonable excuse— a obstructs any person acting under the authority of Network Rail in setting out the lines of the scheduled works or in constructing any authorised work; or b interferes with, moves or removes any apparatus belonging to any person acting under the authority
What would breach article 33?
These are illustrations, not law. They are generated from the provision’s own words to show the shape of the offence. Whether any particular conduct is caught depends on the full text, on any amendment since, and on the facts.
- Refusing to let an inspector onto premises they are entitled to enter under the Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020.
- Sending an official away, or telling staff to say nothing, where the power being exercised does not depend on anyone's consent.
- Physically blocking an examination, or removing something an officer has said they intend to inspect.
Penalty
- Mode of trial
- Summary only — tried in a magistrates’ court
- Maximum fine
- £1,000
- Standard scale
- Level 3
- Maximum prison (summary)
- Not determined
Sentencing
Offences of this kind are usually sentenced under the guidelines below. This is a mapping by subject, not a finding about this provision, and the links go to a search of the Sentencing Council’s own site.
-
Sentencing organisations: fines and the means of a corporate defendant
All courts in England and Wales
How a fine on a company is arrived at from its turnover. Relevant far beyond the guidelines that state it, because a very large share of the offences in this corpus can only be committed by an organisation.
-
Health and safety offences, corporate manslaughter and food safety and hygiene offences: definitive guideline
Magistrates' courts and the Crown Court in England and Wales · in force from 1 February 2016
Covers breaches of duty under the Health and Safety at Work etc. Act 1974 and the regulations made under it, and food safety and food hygiene offences. Sentencing turns on culpability and on the seriousness and likelihood of harm risked, not only on the harm that happened.
-
Reduction in sentence for a guilty plea: definitive guideline
All courts in England and Wales · in force from 1 June 2017
The sliding scale of credit for pleading guilty, from one third at the first stage of proceedings downwards.
-
General guideline: overarching principles
All courts in England and Wales · in force from 1 October 2019
The guideline a court uses when there is no offence-specific guideline, which is the position for the overwhelming majority of offences created by statutory instrument. It sets out how culpability and harm are assessed from first principles.
-
Totality: definitive guideline
All courts in England and Wales
How to sentence more than one offence at once so that the total is just and proportionate - frequently in point here, because regulatory prosecutions commonly charge several breaches of the same instrument.
Prosecution figures
No published per-offence figure was found for this provision, and it could not be matched to a Ministry of Justice offence code. Offences created by statutory instrument very largely do not have one. Absence of a figure is not evidence that the offence is unused.
Status and lifecycle
- Current status
- Status not determined
- Made
- 10 December 2020
- In force from
- 31 December 2020
- Extent
- Not stated
How this was established: read from the text as made; no revised version available, so later revocation could not be ruled out.
What the instrument is for
(This note is not part of the Order) — the explanatory note published with the instrument, © Crown copyright.
This Order confers powers on Network Rail to close or downgrade the level crossings specified in articles 15 and 28, Schedule 2 and Schedule 4 and for the temporary use of land in connection with the construction of public rights of way and other works in the highway where these are required in connection with the level crossing changes. The Order authorises the construction of works in connection with the closure of the level crossings, the extinguishment of existing public and private rights of way and the creation of alternative rights of way and other rights in land. A copy of the deposited plans and the book of reference referred to in the Order may be inspected at the offices of the Company Secretary and Solicitor to Network Rail Infrastructure Limited at Network Rail National Records Centre, Unit 5, Audax Road, Clifton Moor, York, YO30 4US.
Read the full note and every offence in this instrument
How this was identified as an offence
Everything above rests on the judgement that this provision creates a criminal offence, rather than mentioning one. That judgement is made by rule, from the words of the provision, and this is the rule that made it — with a confidence of 0.92.
- Basis
- the provision says a person is “guilty of an offence”
- Confidence
- 0.92 of 1.00
A provision that states a penalty for an offence created elsewhere can read very like one that creates an offence, and the rules can mistake the one for the other. If the text quoted above sets a penalty for something made an offence by another provision, treat the classification on this page with that in mind, and read the instrument.
Check the source
- This provision on legislation.gov.uk The authoritative text. Check it before relying on anything here.
- The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 Every offence this instrument creates, and its explanatory note
- Transport: maritime, aviation, rail and harboursOther offences on the same subject
- Offences created in 2020