Appeals (general provisions)
regulation 14(10) of Environmental Impact Assessment (Uncultivated Land and Semi-Natural Areas) Regulations (Northern Ireland) 2006 (revoked)
- Status not determined
- Requires proof of a state of mind
- Either way
- Agriculture, plant health, food production and rural affairs
This offence was read from the text as made, and no revised version was available, so a later revocation could not be ruled out. Check the current text at legislation.gov.uk.
What the provision says
10 Any person who refuses or deliberately fails to attend in obedience to
a summons issued in accordance with paragraph (8) or refuses to give evidence or to produce any book or other document which he is required or is liable to be required to produce for the purposes of these Regulations shall be guilty of an offence.
Text as made, from legislation.gov.uk. © Crown copyright, reused under the Open Government Licence v3.0. This is the text as originally made; later amendments are not shown here.
Who it binds, and what has to be proved
- Binds
- a person
- Conduct
- failing to do something the instrument requires
- Fault element
- Requires proof of a state of mind
- Burden of proof
- No statutory defence — prosecution proves everything
The prosecution must prove both that the conduct happened and that it was done with the state of mind the provision names (deliberately).
The provision states no defence, so the prosecution bears the burden on every element of the offence.
Classifier’s reasoning: mens rea word in the offence-creating words: deliberately.
What would breach regulation 14(10)?
These are illustrations, not law. They are generated from the provision’s own words to show the shape of the offence. Whether any particular conduct is caught depends on the full text, on any amendment since, and on the facts.
- Not doing what the provision requires under the Environmental Impact Assessment (Uncultivated Land and Semi-Natural Areas) Regulations (Northern Ireland) 2006, by the time it requires it to be done.
- Doing it, but not in the manner or to the standard the instrument specifies.
Penalty
- Mode of trial
- Either way — magistrates’ court or Crown Court
- Maximum fine
- £5,000
- Maximum prison (summary)
- Not determined
expressed as the statutory maximum (the prescribed sum): the same words mean £5,000 in England and Wales and £10,000 in Scotland.
Sentencing
Offences of this kind are usually sentenced under the guidelines below. This is a mapping by subject, not a finding about this provision, and the links go to a search of the Sentencing Council’s own site.
-
Animal cruelty: definitive guideline
Magistrates' courts in England and Wales · in force from 1 July 2017
Covers cruelty to and neglect of animals, and the associated disqualification and deprivation orders.
-
Health and safety offences, corporate manslaughter and food safety and hygiene offences: definitive guideline
Magistrates' courts and the Crown Court in England and Wales · in force from 1 February 2016
Covers breaches of duty under the Health and Safety at Work etc. Act 1974 and the regulations made under it, and food safety and food hygiene offences. Sentencing turns on culpability and on the seriousness and likelihood of harm risked, not only on the harm that happened.
-
Imposition of community and custodial sentences: definitive guideline
All courts in England and Wales
When a community order or custody is justified at all, and the presumption against short custodial sentences.
-
Reduction in sentence for a guilty plea: definitive guideline
All courts in England and Wales · in force from 1 June 2017
The sliding scale of credit for pleading guilty, from one third at the first stage of proceedings downwards.
-
General guideline: overarching principles
All courts in England and Wales · in force from 1 October 2019
The guideline a court uses when there is no offence-specific guideline, which is the position for the overwhelming majority of offences created by statutory instrument. It sets out how culpability and harm are assessed from first principles.
-
Totality: definitive guideline
All courts in England and Wales
How to sentence more than one offence at once so that the total is just and proportionate - frequently in point here, because regulatory prosecutions commonly charge several breaches of the same instrument.
Prosecution figures
No published per-offence figure was found for this provision, and it could not be matched to a Ministry of Justice offence code. Offences created by statutory instrument very largely do not have one. Absence of a figure is not evidence that the offence is unused.
Status and lifecycle
- Current status
- Status not determined
- Made
- 2 March 2006
- In force from
- 17 April 2006
- Extent
- Not stated
How this was established: read from the text as made; no revised version available, so later revocation could not be ruled out.
What the instrument is for
(This note is not part of the Regulations) — the explanatory note published with the instrument, © Crown copyright.
These Regulations implement Directive 2003/35/EC (O.J. No. L156, 25.6.2003, p.17) providing for public participation in certain environmental decision making, which amends Council Directive 85/337/EC (O.J. No. L175, 5.7.85, p.40, as amended by Council Directive 97/11/EC, O.J. No. L73, 14.3.97, p.5), (“the EIA Directive”) on the assessment of the effects of certain public and private projects on the environment, insofar as it affects environmental impact assessments of uncultivated land and semi-natural areas. The definition of “project” identifies those activities that are subject to the requirements of the Regulations. Regulation 3 defines the application of the Regulations and specifies those projects which are exempt from the Regulations. Regulation 4 prevents any projects from being undertaken unless a screening decision is first obtained. The screening decision determines whether the project is one that is likely to have significant effects on the environment (which will include a project likely to have a significant effect on a European site within the meaning of the Conservation (Natural Habitats etc.) Regulations (Northern Ireland) 1995 (“the Habitats Regulations”). A project which has been so determined is defined as a “relevant project” in the Regulations. The screening decision must be reached in accordance with the selection criteria set out in Schedule 2 of the Regulations. The procedural requirements in respect of screening decisions are set out in regulation 5. Regulation 6 prohibits a relevant project from being carried out without consent first having been obtained from the Department. Regulation 7 entitles the prospective applicant for consent to obtain an opinion from the Department as to the information which will be required as part of the environmental statement to accompany the application for consent. Regulation 8 requires the consultation bodies listed in Schedule 1 to provide any relevant information in their possession to the applicant for consent. Regulations 9 and 10 contain the procedural requirements for the application for consent. In particular, the application is required to include an environmental statement. This is defined as a statement which includes the information in Part II of Schedule 3 of the Regulations and such of the information in Part I of Schedule 3 as is reasonably required to assess the environmental effects of the project. The Department is required to consult on the application and for this purpose must make available any environmental statement and certain additional information. Regulation 11 contains provisions for notifying and consulting with other EEA states in relation to projects likely to have environmental effects on those states and or giving them the opportunity to make representations in respect of such projects. It also provides for consultation with the other EEA states about corresponding projects on their territory. Regulation 12 prescribes how the Department should decide whether to grant consent for a project. It requires the taking into account all of the information and representations provided in accordance with the Regulations. Under regulation 12(3) the Department may not grant consent for a project which would involve activities prohibited under those provisions of the Habitats Regulations which implement Articles 12,13,15 and 16 (requirements for protection of species) of the Habitats Directive. Paragraphs (4) to (9) of this regulation implement the requirements to be met before consent can be granted for a project which is likely to have a significant effect on a European site. Although the same information and representations need to be taken into account, insofar as they may be relevant, as with any other project, there are specific tests to be met. These specific tests implement Article 6(3) of the Habitats Directive. The provisions in these Regulations are consistent with those in the Habitats Regulations as applied to other consent regimes. Regulation 12(11) specifies mandatory conditions to which the consents are required to be subject to ensure that consents are implemented and that further consent is required for works which are materially different from those permitted. Paragraphs (12) to (14) of regulation 12 contain procedural requirements to be complied with in granting or refusing consent and detail what should be contained in the Department’s notification to the applicant and in related public advertisements. Regulation 12(15) takes account of the provisions in the Wildlife (Northern Ireland) Order 1985 which apply where a competent authority intends to grant consent for any project which consists of an operation likely to damage an area of special scientific interest. Regulation 13 and Schedule 4 implement Article 6(2) of the Habitats Directive by ensuring that any decisions taken in accordance with the Regulations before the designation of a European site which would permit a project to be carried out which would adversely affect the integrity of the site are reviewed and revoked or modified as necessary. An applicant for a screening decision or for consent for a relevant project (or a person interested in a project subject to a revocation or modification under the review provisions contained in Schedule 4) may appeal against an adverse decision to the Department. An appellant is entitled to be heard by a person appointed by the Department for the purpose which hearing may be in public if the Department so decides. The general appeal provisions are contained in regulations 14 to 17. They include provision for determination by written representations or by hearing Regulation 18 outlines the public participation provisions and states what information the Department shall make available to the public in relation to any proposed project. Persons who carry out projects without first obtaining either a negative screening decision or consent for the project, or who act in breach of conditions imposed on a consent, commit an offence under the Regulations. It is also an offence under the Regulations to make false or misleading statements in order to obtain a particular decision (regulations 19-21). If the Department wishes to ensure that unauthorised activities are stopped with immediate effect, it can serve a stop notice on the person carrying out the activities or any person with an interest in the land upon which the activities are taking place (regulation 22). Non-compliance with the stop notice is an offence (regulation 23). Regulation 24 contains a power for the Department to serve a notice requiring a person it believes to be responsible for committing an offence to reinstate the land to its former condition. An appeal against a reinstatement notice may be made to the Magistrates Court. Failure to comply with the requirements of a reinstatement notice is an offence. Regulation 25 contains powers of entry in connection with carrying out the functions of the Department under the Regulations and includes the power to inspect and take copies of records. Powers are also provided to enter land for the purpose of carrying out works of reinstatement following non-compliance with a reinstatement notice. Regulation 26 revokes, with a saving, the Environmental Impact Assessment (Uncultivated Land and Semi-Natural Areas) Regulations (Northern Ireland) 2001.
Read the full note and every offence in this instrument
Other offences in the same instrument
- Any person who begins or carries out a project without first obtaining either a decision that the project is…regulation 19
- Any person who carries out any activity in contravention of any condition of a consent granted in accordance…regulation 20
- Any person who, for the purpose of procuring a particular decision on an application made under these…regulation 21(1)
- Penalties for contravention of a stop noticeregulation 23(1)
- Reinstatementregulation 24(10)
- Powers of entry and default powersregulation 25(7)
How this was identified as an offence
Everything above rests on the judgement that this provision creates a criminal offence, rather than mentioning one. That judgement is made by rule, from the words of the provision, and this is the rule that made it — with a confidence of 0.92.
- Basis
- the provision says a person is “guilty of an offence”
- Confidence
- 0.92 of 1.00
A provision that states a penalty for an offence created elsewhere can read very like one that creates an offence, and the rules can mistake the one for the other. If the text quoted above sets a penalty for something made an offence by another provision, treat the classification on this page with that in mind, and read the instrument.
Check the source
- This provision on legislation.gov.uk The authoritative text. Check it before relying on anything here.
- Environmental Impact Assessment (Uncultivated Land and Semi-Natural Areas) Regulations (Northern Ireland) 2006 (revoked) Every offence this instrument creates, and its explanatory note
- Agriculture, plant health, food production and rural affairsOther offences on the same subject
- Offences created in 2006