UK Offence Report

The Scarweather Sands Offshore Wind Farm Order 2004

Welsh Statutory Instrument 2004 No. 3054 — creates 3 criminal offences.

3offences created
0recorded in force
0revoked
Made
16 November 2004
In force from
19 November 2004
Extent
Not stated
Subject
Housing, planning, heritage and land
Made under
Transport and Works Act 1992

Explanatory note

(This note is not part of the Order) — published with the instrument by the department that made it. © Crown copyright, reused under the Open Government Licence v3.0.

This Order provides for the construction and operation of an offshore wind farm and ancillary works on the bed of Swansea Bay off the coast between Porthcawl and Port Talbot and for the connection of those works via an onshore substation to the electricity distribution system. A copy of the works plans, land plans, sections and of the book of reference prescribed by rule 12(1), (2), (3) and (5) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2000, and certified in accordance with article 34 of this Order, may be inspected at the offices of Scarweather Sands Ltd., PO Box 824, Alexandra Gate, Rover Way, Cardiff, CF24 2SD.

Offences created by this instrument

What Parliament said about it

Hansard was searched for this instrument by name and returned nothing. That is the ordinary outcome: an instrument laid under the negative procedure is usually never debated, and becomes law without a word said about it in either House.

How Parliament handled it

Parliament's Statutory Instruments service records procedure from May 2017 onwards, and this instrument predates it. That is a limit of the source, not a statement that nothing happened.

Check the source