The Network Rail (Essex and Others Level Crossing Reduction) Order 2022
UK Statutory Instrument 2022 No. 651 — creates 1 criminal offence.
- Made
- 9 June 2022
- In force from
- 30 June 2022
- Extent
- Not stated
- Subject
- Transport: maritime, aviation, rail and harbours
- Made under
- Transport and Works Act 1992
Explanatory note
(This note is not part of the Order) — published with the instrument by the department that made it. © Crown copyright, reused under the Open Government Licence v3.0.
This Order confers powers on Network Rail to close or downgrade the level crossings specified in Schedule 2 and for the permanent acquisition of and temporary use of land in connection with the construction of public rights of way and other works in the highway required in connection with the level crossing changes. The Order authorises the construction of works in connection with the closure of the level crossings, the extinguishment of existing public and private rights of way and the creation of alternative rights of way and other rights in land. A copy of the deposited plans and the book of reference referred to in the Order may be inspected, on request, at the offices of Network Rail Infrastructure Limited at Network Rail National Records Centre, Unit 5, Audax Road, Clifton Moor, York YO30 4US.
Offences created by this instrument
- Obstruction of construction of authorised works article 31 · Status not determined · Strict liability
How Parliament handled it
Parliament's Statutory Instruments service has no record of this instrument, although it covers the period. Nothing is inferred from that.
Check the source
- This instrument on legislation.gov.uk The authoritative text, including amendments made since
- Other instruments from 2022