The Associated British Ports (Fisher Fleet Quay) Harbour Revision Order 2014
UK Statutory Instrument 2014 No. 2933 — creates 3 criminal offences.
- Made
- 5 November 2014
- In force from
- 3 December 2014
- Extent
- Not stated
- Subject
- Transport: maritime, aviation, rail and harbours
- Made under
- Harbours Act 1964
Explanatory note
(This note is not part of the Order) — published with the instrument by the department that made it. © Crown copyright, reused under the Open Government Licence v3.0.
This Order empowers Associated British Ports (“A.B. Ports”) to construct and maintain two quays extending the existing quay in Fisher Fleet, King’s Lynn, Norfolk and to renovate the existing quay (article 3), within the limits of deviation on the deposited plans and sections (defined in article 2(1)) (article 5). The Order confers further powers as to subsidiary works and dredging related to those works (articles 4 and 6). The Order creates an offence of intentionally obstructing any person carrying out the works, or intentionally or recklessly interfering with equipment or materials used in carrying out the works, with a fine on summary conviction not exceeding level 3 on the standard scale (article 7). Articles 8 and 9 make provision against danger to navigation and for the abatement of works abandoned or decayed. The Secretary of State is empowered to order a survey and examination of a tidal work or the site on which it is to be constructed (article 10). Provision is made for the lighting of tidal works permanently and during construction (articles 11 and 12). The Order restricts permitted development rights, provided by the Town and Country Planning (General Permitted Development) Order 1995 (S.I. 1995/418) for the development authorised by the Order, by requiring a heritage statement and a written scheme of investigation for areas of archaeological interest to be approved by the local planning authority prior to the commencement of works (article 15 and the Schedule). A full regulatory impact assessment has not been produced for this instrument as no impact on the private or voluntary sectors is foreseen. The deposited plans and sections may be inspected during working hours at the offices of Associated British Ports at 150 Holborn, London EC1N 2LR and at St. Ann’s Fort, King’s Lynn, Norfolk PE30 1QS.
Offences created by this instrument
- Permanent lights on tidal works article 11(2) · Status not determined · Strict liability
- Obstructing works article 7 · Status not determined · Requires proof of a state of mind
- Provision against danger to navigation article 8(2) · Status not determined · Strict liability
What Parliament said about it
Hansard was searched for this instrument by name and returned nothing. That is the ordinary outcome: an instrument laid under the negative procedure is usually never debated, and becomes law without a word said about it in either House.
How Parliament handled it
Parliament's Statutory Instruments service records procedure from May 2017 onwards, and this instrument predates it. That is a limit of the source, not a statement that nothing happened.
Check the source
- This instrument on legislation.gov.uk The authoritative text, including amendments made since
- Other instruments from 2014