The Network Rail (West Coast Main Line) Order 2004
UK Statutory Instrument 2004 No. 389 — creates 2 criminal offences.
- Made
- 12 February 2004
- In force from
- 4 March 2004
- Extent
- Not stated
- Subject
- Housing, planning, heritage and land
- Made under
- Transport and Works Act 1992
Explanatory note
(This note is not part of the Order) — published with the instrument by the department that made it. © Crown copyright, reused under the Open Government Licence v3.0.
This Order provides for the construction of works for the four tracking of the West Coast Main Line railway between Tamworth and Lichfield stations in the borough of Tamworth and district of Lichfield in the county of Staffordshire for the purpose of increasing the operating capacity of the railway, with the separation of road vehicles and pedestrians from the railway, together with all necessary related works and conveniences. A copy of the deposited plans, the deposited sections and the book of reference referred to in this Order may be inspected at the offices of the Company Secretary and Solicitor to Network Rail Infrastructure Limited, 40 Melton Street, London NW1 2EE.
Offences created by this instrument
- Maintenance of approved works etc article 35(2) · Status not determined · Strict liability
- Disclosure of confidential information article 37 · Status not determined · Strict liability
What Parliament said about it
Hansard was searched for this instrument by name and returned nothing. That is the ordinary outcome: an instrument laid under the negative procedure is usually never debated, and becomes law without a word said about it in either House.
How Parliament handled it
Parliament's Statutory Instruments service records procedure from May 2017 onwards, and this instrument predates it. That is a limit of the source, not a statement that nothing happened.
Check the source
- This instrument on legislation.gov.uk The authoritative text, including amendments made since
- Other instruments from 2004