The Heathrow Airport–London Noise Insulation Grants Scheme 1989
UK Statutory Instrument 1989 No. 247 — creates 1 criminal offence.
- Made
- 23 February 1989
- In force from
- 1 April 1989
- Extent
- Not stated
- Subject
- Transport: maritime, aviation, rail and harbours
- Made under
- Civil Aviation Act 1982
Explanatory note
(This note is not part of the Scheme) — published with the instrument by the department that made it. © Crown copyright, reused under the Open Government Licence v3.0.
The Airports Policy White Paper (Cmnd 9542), published in June 1985, committed the Government to reviewing the Heathrow Airport–London Noise Insulation Grants Scheme 1980 which, as varied, applied to dwellings the construction of which was completed before 1st April 1980 and to insulation works carried out to such dwellings before 1st April 1985. That review has now been completed. The findings indicate that some small extensions are needed to the boundaries of the previous Scheme. This Scheme implements the findings of the review so as to meet the continuing need for domestic sound insulation in the vicinity of Heathrow Airport. The conditions of eligibility and the specifications for insulation works are in other respects the same as in the previous Scheme. The maximum amount of grant payable has been adjusted to take account of increased costs since 1980. This Scheme requires Heathrow Airport Limited to pay grants towards the cost of insulation. It comes into force on 1st April 1989 and relates to dwellings which are situated within the area designated on a map deposited at the office of the Departmental Record Officer at Romney House, 43 Marsham Street, London, SW1, a certified copy of which will be open to inspection free of charge at all reasonable hours in Room S8/08, 2 Marsham Street, London, SW1. Copies will similarly be available at the offices of Heathrow Airport Limited, at D'Albiac House, Heathrow Airport and at the offices of BAA plc at 130, Wilton Road, London, SW1V 1LQ. The principal changes made in relation to the previous Scheme are: 1 This Scheme will be administered by Heathrow Airport Limited, not by the local authorities in the area covered by the Scheme. 2 The closing date for lodging applications is 31st March 1991 and the insulation work must be completed before 30th September 1992. 3 This Scheme applies to a relatively small area beyond the boundary of the previous Scheme, within which it appears to the Secretary of State that dwellings require protection from noise and vibration attributable to the aerodrome.
Offences created by this instrument
- Contravention of The Heathrow Airport–London Noise Insulation Grants Scheme 1989 the instrument as a whole · Revoked · Strict liability
What Parliament said about it
Hansard was searched for this instrument by name and returned nothing. That is the ordinary outcome: an instrument laid under the negative procedure is usually never debated, and becomes law without a word said about it in either House.
How Parliament handled it
Parliament's Statutory Instruments service records procedure from May 2017 onwards, and this instrument predates it. That is a limit of the source, not a statement that nothing happened.
Check the source