This offence was read from the text as made, and no revised version was available, so a later revocation could not be ruled out. Check the current text at legislation.gov.uk.
What the provision says
Contravening this instrument is an offence under section
35 of the Building Act 1984. The instrument itself contains no offence-creating words.
Text as made, from legislation.gov.uk. © Crown copyright, reused under the Open Government Licence v3.0. This is the text as originally made; later amendments are not shown here.
Who it binds, and what has to be proved
- Binds
- a person
- Conduct
- breaching the provision
- Fault element
- Strict liability
- Burden of proof
- Not determined
The prosecution must prove that the conduct happened. This is a strict liability offence as drafted: the provision uses no word of intention, knowledge, recklessness or negligence, so there is no need to show that a person meant to do it, knew about it, or was careless.
Intention, knowledge and carelessness are irrelevant to guilt. They may still matter a great deal to sentence.
Classifier’s reasoning: contravention offences of this kind are strict as to the breach; the fault position is governed by the parent Act and was not read from it.
What would breach the instrument as a whole?
These are illustrations, not law. They are generated from the provision’s own words to show the shape of the offence. Whether any particular conduct is caught depends on the full text, on any amendment since, and on the facts.
- Doing what the provision prohibits, or failing to do what it requires under the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023.
Penalty
- Mode of trial
- Set by another provision — the instrument states the penalty by reference to an Act or to another regulation
- Maximum fine
- Not determined
- Maximum prison (summary)
- Not determined
The instrument does not state a penalty itself. It sets one by reference to section 35 of the Building Act 1984.
the penalty is in the parent Act, not in this instrument.
No penalty was determined from this instrument. It may be in the enabling Act, or in a general penalties provision this pass did not connect to the offence. Absence of a figure here is not evidence that the offence carries no penalty.
Sentencing
Offences of this kind are usually sentenced under the guidelines below. This is a mapping by subject, not a finding about this provision, and the links go to a search of the Sentencing Council’s own site.
-
Environmental offences: definitive guideline
Magistrates' courts and the Crown Court in England and Wales · in force from 1 July 2014
Covers unauthorised or harmful deposit, treatment or disposal of waste, illegal discharges to air, land and water, and the equivalent offences committed by organisations. It is the guideline that introduced turnover bands for corporate fines, so the size of the defendant company is a starting point rather than a mitigating detail.
-
Reduction in sentence for a guilty plea: definitive guideline
All courts in England and Wales · in force from 1 June 2017
The sliding scale of credit for pleading guilty, from one third at the first stage of proceedings downwards.
-
General guideline: overarching principles
All courts in England and Wales · in force from 1 October 2019
The guideline a court uses when there is no offence-specific guideline, which is the position for the overwhelming majority of offences created by statutory instrument. It sets out how culpability and harm are assessed from first principles.
-
Totality: definitive guideline
All courts in England and Wales
How to sentence more than one offence at once so that the total is just and proportionate - frequently in point here, because regulatory prosecutions commonly charge several breaches of the same instrument.
Prosecution figures
No published per-offence figure was found for this provision, and it could not be matched to a Ministry of Justice offence code. Offences created by statutory instrument very largely do not have one. Absence of a figure is not evidence that the offence is unused.
Status and lifecycle
- Current status
- Status not determined
- Made
- 9 August 2023
- In force from
- 1 October 2023
- Extent
- Not stated
How this was established: read from the text as made; no revised version available, so later revocation could not be ruled out.
What the instrument is for
(This note is not part of the Regulations) — the explanatory note published with the instrument, © Crown copyright.
This instrument is part of a number of Regulations which implement Part 3 of the Building Safety Act 2022 (c. 30). Section 91ZA of the Building Act 1984 (as inserted by section 32 of the Building Safety Act 2022, which is to come into force on 1st October 2023, provides for the regulator to be the building control authority in relation to any higher-risk building in England and any proposed higher-risk building. The requirements in the Building Regulations 2010 continue to apply to higher-risk buildings. Amendments (to be made elsewhere) to those Regulations disapply most of the procedural requirements in those Regulations, consequently procedures in this instrument apply instead. Part 2 of these Regulations sets out the procedures for applying for building control approval in relation to higher-risk buildings. Applications must be submitted to the regulator giving the information required and accompanied by the plans and documents required. Building control approval may, with the applicant’s consent, be subject to a requirement, for example, to not progress beyond a specified point without agreement of the regulator or that more detailed plans or documents could be approved by the regulator at a later date. Part 3 of these Regulations sets out the change control process where any document relating to the work which was approved by the regulator at the application stage (or subsequently under a requirement or a change control) is to be changed. And provision is also made in this Part for change to the client, principal contractor or principal designer, insolvency etc of a client and variation of a requirement imposed on a building control approval. Part 4 of these Regulations sets out provisions in relation the golden thread information, mandatory occurrence reporting and the handover of information on completion of the work. Part 5 of these Regulations sets out the procedures for applying for a completion certificate in relation to higher-risk buildings. Applications must be submitted to the regulator giving the information required and accompanied by the plans and documents required. Provision is also made for partial completion certificates where it is proposed a building (or part of a building) is occupied before all of the higher-risk building work is completed. Part 6 of these Regulations sets out provision relating to inspections, testing and sampling, regularisation of unauthorised work, review by the regulator of its decisions, and appeals in relation to reviewed decisions and the procedure under section 30A of the Building Act 1984 (which provides that a request can be made to the Secretary of State for determination of an application where the regulator has not made a decision within the time limit prescribed). Part 7 of these Regulations defines exempt work, gives the regulator the power by direction to require an application to be sent to it via a specified method, and also sets out those provisions in relation to which a stop notice under section 35C of that Act may be given. Part 7 also includes consequential amendments to the Regulatory Reform (Fire Safety) Order 2005 (S.I. 2005/1541); the Community Infrastructure Levy Regulations 2010 (S.I. 2010/948); and the Building Safety (Responsible Actors Scheme and Prohibitions) Regulations 2023 (S.I. 2023/753). Schedule 3 to these Regulations sets out transitional, supplementary and saving provisions in relation to projects for higher-risk building work for which plans were deposited or initial notices given before 1st October 2023. A full impact assessment of the effect that this instrument will have on the costs to business is published with an Explanatory Memorandum alongside the instrument on www.legislation.gov.uk.
Read the full note and every offence in this instrument
How this became law
This instrument became law without a debate or a vote. Under the negative procedure it took effect unless a motion to stop it succeeded, and none was tabled.
Neither House could have amended it. A statutory instrument is put to each House as a whole thing, to be approved or not; the Houses can reject an instrument or record their regret, but they cannot change a word of it. That is the constitutional position for every offence on this site.
What Parliament said
Mentions of this instrument in Hansard. Parliamentary material is reused under the Open Parliament Licence v3.0.
-
Building Safety: Second Staircases
Commons · 24 October 2023 · The Secretary of State for Levelling Up, Housing and Communities (Michael Gove)
This Government are committed to ensuring that people can be confident that our buildings are safe. The Building Safety Act set up a new, robust regime, with a new Building Safety Regulator at its heart. In recent years, we have also changed statutory guidance on fire safety, with new measures including: a ban on combustible materials for residential buildings, hotels, hospitals and student accommodation above 18m,…
How this was identified as an offence
Everything above rests on the judgement that this provision creates a criminal offence, rather than mentioning one. That judgement is made by rule, from the words of the provision, and this is the rule that made it — with a confidence of 0.55.
- Basis
- the penalty comes from the enabling Act rather than from this instrument
- Confidence
- 0.55 of 1.00
A provision that states a penalty for an offence created elsewhere can read very like one that creates an offence, and the rules can mistake the one for the other. If the text quoted above sets a penalty for something made an offence by another provision, treat the classification on this page with that in mind, and read the instrument.
Check the source
- This provision on legislation.gov.uk The authoritative text. Check it before relying on anything here.
- The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 Every offence this instrument creates, and its explanatory note
- Housing, planning, heritage and landOther offences on the same subject
- Offences created in 2023