Obstruction of construction of authorised works

article 25 of The Midland Metro (Birmingham Eastside Extension) Order 2020

This offence was read from the text as made, and no revised version was available, so a later revocation could not be ruled out. Check the current text at legislation.gov.uk.

What the provision says

25 Any person who, without reasonable excuse—

a obstructs another person acting under the authority of the Authority in setting out the lines of the scheduled works, or in constructing any of the authorised works; or

b interferes with, moves or removes any apparatus belonging to any person acting under the authority of the Authority, is guilty of an offence and liable on summary conviction to

a fine not exceeding level

3 on the standard scale.

Text as made, from legislation.gov.uk. © Crown copyright, reused under the Open Government Licence v3.0. This is the text as originally made; later amendments are not shown here.

Who it binds, and what has to be proved

Binds
a person
Conduct
obstructing an official exercising a power
Fault element
Strict liability
Burden of proof
An element of the offence, for the prosecution to prove

The prosecution must prove that the conduct happened. This is a strict liability offence as drafted: the provision uses no word of intention, knowledge, recklessness or negligence, so there is no need to show that a person meant to do it, knew about it, or was careless.

Intention, knowledge and carelessness are irrelevant to guilt. They may still matter a great deal to sentence.

“Without reasonable excuse” here is an element of the offence rather than a defence, so its absence is for the prosecution to prove (R v Charles [2009] EWCA Crim 1570).

Classifier’s reasoning: no word of intention, knowledge, recklessness or negligence in the offence or its provision; qualified by reasonable excuse (an element; prosecution disproves once raised).

The defence, as drafted

25 Any person who, without reasonable excuse— a obstructs another person acting under the authority of the Authority in setting out the lines of the scheduled works, or in constructing any of the authorised works; or b interferes with, moves or removes any apparatus belonging to any person acting under

What would breach article 25?

These are illustrations, not law. They are generated from the provision’s own words to show the shape of the offence. Whether any particular conduct is caught depends on the full text, on any amendment since, and on the facts.

  1. Refusing to let an inspector onto premises they are entitled to enter under the Midland Metro (Birmingham Eastside Extension) Order 2020.
  2. Sending an official away, or telling staff to say nothing, where the power being exercised does not depend on anyone's consent.
  3. Physically blocking an examination, or removing something an officer has said they intend to inspect.

Penalty

Mode of trial
Summary only — tried in a magistrates’ court
Maximum fine
£1,000
Standard scale
Level 3
Maximum prison (summary)
Not determined

Sentencing

Offences of this kind are usually sentenced under the guidelines below. This is a mapping by subject, not a finding about this provision, and the links go to a search of the Sentencing Council’s own site.

Prosecution figures

No published per-offence figure was found for this provision, and it could not be matched to a Ministry of Justice offence code. Offences created by statutory instrument very largely do not have one. Absence of a figure is not evidence that the offence is unused.

Status and lifecycle

Current status
Status not determined
Made
12 February 2020
In force from
4 March 2020
Extent
Not stated

How this was established: read from the text as made; no revised version available, so later revocation could not be ruled out.

What the instrument is for

(This note is not part of the Order) — the explanatory note published with the instrument, © Crown copyright.

This Order authorises the West Midlands Combined Authority to construct, operate and maintain an extension to the Midland Metro tramway system in Birmingham city centre from the junction of Bull Street and Corporation Street, running east along Lower Bull Street and into Albert Street, across Moor Street Queensway, continuing south under the proposed new High Speed 2 station at Curzon Street and along New Canal Street and Meriden Street, before continuing east along High Street Deritend where the system terminates west of Heath Mill Lane. The Order authorises the compulsory acquisition and the temporary use of land for the purposes of the works and confers other powers in connection with the construction, operation and maintenance of the works. A copy of the works and land plans, the traffic regulation plans and the book of reference mentioned in the Order and certified in accordance with article 51 (certification of plans, etc.) may be inspected free of charge during normal working hours at the offices of West Midlands Combined Authority at 16 Summer Lane, Birmingham, B19 3SD.

Read the full note and every offence in this instrument

Other offences in the same instrument

How this was identified as an offence

Everything above rests on the judgement that this provision creates a criminal offence, rather than mentioning one. That judgement is made by rule, from the words of the provision, and this is the rule that made it — with a confidence of 0.92.

Basis
the provision says a person is “guilty of an offence”
Confidence
0.92 of 1.00

A provision that states a penalty for an offence created elsewhere can read very like one that creates an offence, and the rules can mistake the one for the other. If the text quoted above sets a penalty for something made an offence by another provision, treat the classification on this page with that in mind, and read the instrument.

Check the source