Contravention of The Control of Major Accident Hazards Regulations 2015
the instrument as a whole of The Control of Major Accident Hazards Regulations 2015
- Status not determined
- Strict liability
- Set by another provision
- Health and safety, environment, waste and fisheries
This offence was read from the text as made, and no revised version was available, so a later revocation could not be ruled out. Check the current text at legislation.gov.uk.
What the provision says
Contravening this instrument is an offence under section 33(1)(c) of the Health and Safety at Work etc. Act 1974. The instrument itself contains no offence-creating words.
Text as made, from legislation.gov.uk. © Crown copyright, reused under the Open Government Licence v3.0. This is the text as originally made; later amendments are not shown here.
Who it binds, and what has to be proved
- Binds
- a person
- Conduct
- breaching the provision
- Fault element
- Strict liability
- Burden of proof
- Not determined
The prosecution must prove that the conduct happened. This is a strict liability offence as drafted: the provision uses no word of intention, knowledge, recklessness or negligence, so there is no need to show that a person meant to do it, knew about it, or was careless.
Intention, knowledge and carelessness are irrelevant to guilt. They may still matter a great deal to sentence.
Classifier’s reasoning: contravention offences of this kind are strict as to the breach; the fault position is governed by the parent Act and was not read from it.
What would breach the instrument as a whole?
These are illustrations, not law. They are generated from the provision’s own words to show the shape of the offence. Whether any particular conduct is caught depends on the full text, on any amendment since, and on the facts.
- Doing what the provision prohibits, or failing to do what it requires under the Control of Major Accident Hazards Regulations 2015.
Penalty
- Mode of trial
- Set by another provision — the instrument states the penalty by reference to an Act or to another regulation
- Maximum fine
- Not determined
- Maximum prison (summary)
- Not determined
The instrument does not state a penalty itself. It sets one by reference to section 33(1)(c) of the Health and Safety at Work etc. Act 1974.
the penalty is in the parent Act, not in this instrument.
No penalty was determined from this instrument. It may be in the enabling Act, or in a general penalties provision this pass did not connect to the offence. Absence of a figure here is not evidence that the offence carries no penalty.
Sentencing
Offences of this kind are usually sentenced under the guidelines below. This is a mapping by subject, not a finding about this provision, and the links go to a search of the Sentencing Council’s own site.
-
Sentencing organisations: fines and the means of a corporate defendant
All courts in England and Wales
How a fine on a company is arrived at from its turnover. Relevant far beyond the guidelines that state it, because a very large share of the offences in this corpus can only be committed by an organisation.
-
Environmental offences: definitive guideline
Magistrates' courts and the Crown Court in England and Wales · in force from 1 July 2014
Covers unauthorised or harmful deposit, treatment or disposal of waste, illegal discharges to air, land and water, and the equivalent offences committed by organisations. It is the guideline that introduced turnover bands for corporate fines, so the size of the defendant company is a starting point rather than a mitigating detail.
-
Health and safety offences, corporate manslaughter and food safety and hygiene offences: definitive guideline
Magistrates' courts and the Crown Court in England and Wales · in force from 1 February 2016
Covers breaches of duty under the Health and Safety at Work etc. Act 1974 and the regulations made under it, and food safety and food hygiene offences. Sentencing turns on culpability and on the seriousness and likelihood of harm risked, not only on the harm that happened.
-
Reduction in sentence for a guilty plea: definitive guideline
All courts in England and Wales · in force from 1 June 2017
The sliding scale of credit for pleading guilty, from one third at the first stage of proceedings downwards.
-
General guideline: overarching principles
All courts in England and Wales · in force from 1 October 2019
The guideline a court uses when there is no offence-specific guideline, which is the position for the overwhelming majority of offences created by statutory instrument. It sets out how culpability and harm are assessed from first principles.
-
Totality: definitive guideline
All courts in England and Wales
How to sentence more than one offence at once so that the total is just and proportionate - frequently in point here, because regulatory prosecutions commonly charge several breaches of the same instrument.
Prosecution figures
No published per-offence figure was found for this provision, and it could not be matched to a Ministry of Justice offence code. Offences created by statutory instrument very largely do not have one. Absence of a figure is not evidence that the offence is unused.
Status and lifecycle
- Current status
- Status not determined
- Made
- 2 March 2015
- In force from
- 1 June 2015
- Extent
- Not stated
How this was established: read from the text as made; no revised version available, so later revocation could not be ruled out.
What the instrument is for
(This note is not part of the Regulations) — the explanatory note published with the instrument, © Crown copyright.
These Regulations impose requirements with respect to the control of major accident hazards involving dangerous substances. The expressions “major accident” and “dangerous substances” are defined in regulation 2(1). The Regulations implement Directive 2012/18/EU of the European Parliament and of the Council on the control of major accident hazards involving dangerous substances, amending and subsequently repealing Council Directive 96/82/EC (OJ L 10, 14.1.1997, p. 13) (the “Seveso III Directive”), except for Articles 13 and 15, which relate to land use planning, and Article 30, which was implemented by the Heavy Fuel Oil (Amendment) Regulations 2014 (S.I. 2014/162). The Regulations apply to establishments, as defined in regulation 2(1), where dangerous substances are present or are likely to be present in quantities equal to or exceeding the quantities specified in column 2 of Part 1 or in column 2 of Part 2 of Schedule 1. Establishments may be either a “lower tier establishment” or an “upper tier establishment”, as defined in regulation 2(1). The Regulations do not apply in the circumstances specified in regulation 3(2). Except for a nuclear establishment, which is defined in regulation 2(1), the competent authority for the purposes of the Regulations is— a in England, the Health and Safety Executive (“the Executive”) and the Environment Agency acting jointly; b in Wales, the Executive and the Natural Resources Body for Wales acting jointly; and c in Scotland, the Executive and the Scottish Environment Protection Agency acting jointly (regulation 4(b)). In relation to a nuclear establishment, the competent authority is— a in England, the Office for Nuclear Regulation (“the ONR”) and the Environment Agency acting jointly; b in Wales, the ONR and the Natural Resources Body for Wales acting jointly; and c in Scotland, the ONR and the Scottish Environment Protection Agency acting jointly (regulation 4(a)). The Regulations— a impose a duty on an operator (as defined in regulation 2(1)) to take all measures necessary to prevent major accidents and to limit their consequences for human health and the environment (regulation 5(1)); b impose a duty on an operator to demonstrate to the competent authority that it has taken all measures necessary as specified in the Regulations (regulation 5(2)); c impose a duty on an operator to provide the competent authority with all assistance necessary to enable the competent authority to perform its functions under the Regulations (regulation 5(3)); d impose a duty on an operator to provide assistance as necessary to the competent authority to enable the carrying out of inspections and investigations and to gather any necessary information to enable the competent authority to perform its functions under the Regulations (regulation 5(4)); e impose a duty on an operator to send the competent authority a notification containing specified information— i within a reasonable period of time prior to the start of construction of a new establishment (regulation 6(1))(the expression “new establishment” is defined in regulation 2(1)); ii within a reasonable period of time prior to the start of operation of a new establishment (regulation 6(2)), except that this does not need to contain information already contained in a notification sent under regulation 6(1) if that information is still valid; iii by 1st June 2016 in the case of an existing establishment (regulation 6(4))(the expression “existing establishment” is defined in regulation 2(2)); iv in the case of an other establishment, within one year from the date when the establishment first becomes an other establishment (regulation 6(5))(the expression “other establishment” is defined in regulation 2(1)); and v in advance, in the case of specified events (regulation 6(6)); f impose a duty on an operator to prepare and retain in writing a major accident prevention policy containing specified information and to revise it in specified circumstances (regulation 7 and Schedule 2); g require the operator of an upper tier establishment to send at specified times a safety report to the competent authority (for the purposes specified in regulation 8) containing specified information, and not to start construction or operation of the establishment or to permit modifications to the establishment leading to a change in the inventory of dangerous substances, until it has received the competent authority’s conclusions of its examination of the safety report (regulation 9 and Schedule 3); h require the operator of an upper tier establishment to review and revise the safety report in specified circumstances (regulation 10); i require the operator of an upper tier establishment to prepare an internal emergency plan with specified objectives (specified in regulation 11), containing specified information and to review and test the plan (regulation 12 and Schedule 4); j require a local authority (as defined in regulation 2(1)) in whose area there is an upper tier establishment to prepare an external emergency plan with specified objectives (set out in regulation 11) and containing specified information (regulation 13 and Schedule 4), subject to any exemption that may be granted by the competent authority under regulation 15; k require a local authority to review and to test the external emergency plan (regulation 14); l require an operator or local authority who has prepared an emergency plan under a duty imposed by the Regulations to put it into effect in specified circumstances (regulation 16); m require the competent authority to ensure that specified information is made available to the public, including by electronic means, in specified circumstances (regulation 17); n require the operator of an upper tier establishment to send regularly to specified persons in an area notified by the competent authority (as being an area which in the opinion of the competent authority persons are liable to be affected by a major accident occurring at the establishment) specified information in the most appropriate form without them having to request it (regulation 18); o require the competent authority to adopt a specified procedure in dealing with a request for information (regulation 19); p require the competent authority to provide a potentially affected Member State with sufficient information where an upper tier establishment presents a major accident hazard with possible trans-boundary consequences (regulation 20); q give the competent authority power to accept information in another document (regulation 21); r impose functions on the competent authority with respect to— i its examination of the safety report sent by the operator (regulation 22); ii prohibiting the operation of an establishment (regulation 23); iii its identification of domino groups of establishments, and impose duties on the operators of such establishments to co-operate in relation to specified matters (regulation 24); iv inspections and investigations (regulation 25); s impose specified requirements as regards action to be taken following a major accident on the operator of the establishment concerned, the competent authority and the local authority in whose administrative area the accident has occurred (regulation 26); t impose functions on the competent authority with respect to enforcement and penalties (regulation 27); u provide for fees to be payable by the operator to the competent authority for the performance of specified functions by the Executive, ONR or appropriate agency (regulation 28); v provide for fees to be payable by the operator to the local authority for the preparation, review and testing of the external emergency plan (regulation 29); w amend the legislation specified in Schedule 6 (regulation 30); x revoke the Control of Major Accident Hazards Regulations 1999, and certain other instruments which amended them (regulation 31); y contain saving and transitional provisions (regulations 32 and 33); z require the Secretary of State to carry out a review of these Regulations within five years of their commencement (regulation 34). A full impact assessment of the effect that these Regulations would have on the costs of business and the voluntary sector is published with the Explanatory Memorandum, which is available alongside the instrument on www.legislation.gov.uk. The transposition note in relation to the implementation of the Seveso III Directive is also published with the Explanatory Memorandum and available on that website. Copies of these documents are available in the libraries of both Houses of Parliament.
Read the full note and every offence in this instrument
What Parliament said
Mentions of this instrument in Hansard. Parliamentary material is reused under the Open Parliament Licence v3.0.
-
European Union (Withdrawal) Bill
Commons · 15 November 2017 · The Solicitor General
May I make progress? I would be grateful, as I need to make progress on the amendments. I think I have been more than generous in giving way. I will move on to try to ensure that I deal with all the points that have been raised. May I deal first with health and safety legislation? There has been a lot of proper debate about that. The way existing powers are used—the way the UK meets its obligations to implement EU…
-
Public Order Bill (Second sitting)
Commons · 9 June 2022 · Sarah Jones (Croydon Central) (Lab)
Q 58 Let me ask both of you to describe your experiences with protests. It would be useful if you described the police response, what they were able to do and what happened as a result, whether you used injunctions and what that managed to achieve, and gave us the scale and a flavour of the challenges you faced. Elizabeth de Jong: Our experience of protests until April this year was that they were mainly peaceful…
-
Lithium-Ion Battery Storage (Fire Safety and Environmental Permits)
Commons · 7 September 2022 · Dame Maria Miller (Basingstoke) (Con)
I beg to move, That leave be given to bring in a Bill to make local fire services statutory consultees for industrial lithium-ion battery storage planning permission applications; to make provision about the granting of environmental permits for industrial lithium-ion battery storage; and for connected purposes. The Bill would ensure that industrial lithium-ion battery storage facilities are correctly categorised…
-
Public Health England (Dissolution) (Consequential Amendments) Regulations 2023
Commons · 26 June 2023 · The Parliamentary Under-Secretary of State for Health and Social Care (Neil O'Brien)
I have today published the draft statutory instrument the Public Health England (Dissolution) (Consequential Amendments) Regulations 2023 and accompanying explanatory memorandum. This statutory instrument (SI) amends other regulations in consequence of the Government’s reforms to the public health system in England and the dissolution of Public Health England (PHE) on 30 September 2021. The various regulations,…
How this was identified as an offence
Everything above rests on the judgement that this provision creates a criminal offence, rather than mentioning one. That judgement is made by rule, from the words of the provision, and this is the rule that made it — with a confidence of 0.70.
- Basis
- the penalty comes from the enabling Act rather than from this instrument
- Confidence
- 0.70 of 1.00
A provision that states a penalty for an offence created elsewhere can read very like one that creates an offence, and the rules can mistake the one for the other. If the text quoted above sets a penalty for something made an offence by another provision, treat the classification on this page with that in mind, and read the instrument.
Check the source
- This provision on legislation.gov.uk The authoritative text. Check it before relying on anything here.
- The Control of Major Accident Hazards Regulations 2015 Every offence this instrument creates, and its explanatory note
- Health and safety, environment, waste and fisheriesOther offences on the same subject
- Offences created in 2015