Civil penalties: excess emissions
regulation 39(1) of The Greenhouse Gas Emissions Trading Scheme Regulations 2005 (revoked)
- Status not determined
- Strict liability
- Either way
- Health and safety, environment, waste and fisheries
This offence was read from the text as made, and no revised version was available, so a later revocation could not be ruled out. Check the current text at legislation.gov.uk.
What the provision says
1 Any operator who fails to comply with
a condition imposed pursuant to regulation 10(3) in respect of an installation shall be liable to
a penalty.
Text as made, from legislation.gov.uk. © Crown copyright, reused under the Open Government Licence v3.0. This is the text as originally made; later amendments are not shown here.
Who it binds, and what has to be proved
- Binds
- an operator
- Conduct
- breaching a condition of a licence, permit or consent
- Fault element
- Strict liability
- Burden of proof
- No statutory defence — prosecution proves everything
The prosecution must prove that the conduct happened. This is a strict liability offence as drafted: the provision uses no word of intention, knowledge, recklessness or negligence, so there is no need to show that an operator meant to do it, knew about it, or was careless.
Intention, knowledge and carelessness are irrelevant to guilt. They may still matter a great deal to sentence.
The provision states no defence, so the prosecution bears the burden on every element of the offence.
Classifier’s reasoning: no word of intention, knowledge, recklessness or negligence in the offence or its provision.
What would breach regulation 39(1)?
These are illustrations, not law. They are generated from the provision’s own words to show the shape of the offence. Whether any particular conduct is caught depends on the full text, on any amendment since, and on the facts.
- On these words an offence is committed where an operator fails to comply with a condition imposed pursuant to regulation 10(3) in respect of an installation.
- Holding a valid licence but doing the thing it allows outside the hours, place or limits its conditions set under the Greenhouse Gas Emissions Trading Scheme Regulations 2005.
- Failing to do something a condition positively requires - a record, a notification, a monitoring step - even though the licensed activity itself is carried on properly.
Penalty
- Mode of trial
- Either way — magistrates’ court or Crown Court
- Maximum fine
- £5,000
- Maximum prison (summary)
- 3 months
- Maximum prison (on indictment)
- 2 years
expressed as the statutory maximum (the prescribed sum): the same words mean £5,000 in England and Wales and £10,000 in Scotland.
Sentencing
Offences of this kind are usually sentenced under the guidelines below. This is a mapping by subject, not a finding about this provision, and the links go to a search of the Sentencing Council’s own site.
-
Sentencing organisations: fines and the means of a corporate defendant
All courts in England and Wales
How a fine on a company is arrived at from its turnover. Relevant far beyond the guidelines that state it, because a very large share of the offences in this corpus can only be committed by an organisation.
-
Environmental offences: definitive guideline
Magistrates' courts and the Crown Court in England and Wales · in force from 1 July 2014
Covers unauthorised or harmful deposit, treatment or disposal of waste, illegal discharges to air, land and water, and the equivalent offences committed by organisations. It is the guideline that introduced turnover bands for corporate fines, so the size of the defendant company is a starting point rather than a mitigating detail.
-
Health and safety offences, corporate manslaughter and food safety and hygiene offences: definitive guideline
Magistrates' courts and the Crown Court in England and Wales · in force from 1 February 2016
Covers breaches of duty under the Health and Safety at Work etc. Act 1974 and the regulations made under it, and food safety and food hygiene offences. Sentencing turns on culpability and on the seriousness and likelihood of harm risked, not only on the harm that happened.
-
Imposition of community and custodial sentences: definitive guideline
All courts in England and Wales
When a community order or custody is justified at all, and the presumption against short custodial sentences.
-
Reduction in sentence for a guilty plea: definitive guideline
All courts in England and Wales · in force from 1 June 2017
The sliding scale of credit for pleading guilty, from one third at the first stage of proceedings downwards.
-
General guideline: overarching principles
All courts in England and Wales · in force from 1 October 2019
The guideline a court uses when there is no offence-specific guideline, which is the position for the overwhelming majority of offences created by statutory instrument. It sets out how culpability and harm are assessed from first principles.
-
Totality: definitive guideline
All courts in England and Wales
How to sentence more than one offence at once so that the total is just and proportionate - frequently in point here, because regulatory prosecutions commonly charge several breaches of the same instrument.
Prosecution figures
No published per-offence figure was found for this provision, and it could not be matched to a Ministry of Justice offence code. Offences created by statutory instrument very largely do not have one. Absence of a figure is not evidence that the offence is unused.
Status and lifecycle
- Current status
- Status not determined
- Made
- 23 March 2005
- In force from
- 21 April 2005
- Extent
- Not stated
How this was established: read from the text as made; no revised version available, so later revocation could not be ruled out.
What the instrument is for
(This note is not part of the Regulations) — the explanatory note published with the instrument, © Crown copyright.
These Regulations consolidate the Greenhouse Gas Emissions Trading Scheme Regulations 2003 (S.I. 2003/3311) (the “2003 Regulations”) and the Greenhouse Gas Emissions Trading Scheme (Amendment) Regulations 2004 (S.I. 2004/3390) (the “2004 Regulations”) with amendments. In addition to minor and drafting changes, the Regulations include substantive amendments to make provision for the treatment of new installations and installations which cease to carry out an activity listed in Schedule 1 of the Regulations, to provide for subsistence charges in relation to permits and to take account of the entry into force of the Commission Regulation 2216/2004 for a standardised and secured system of registries pursuant to Directive 2003/87/EC of the European Parliament and the Council and of the Council Decision 280/204/EC of the European Parliament and of the Council (the “Registries Regulation”) and of the Commission Decision 2004/156/EC establishing guidelines for the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC of the European Parliament and of the Council. The Regulations provide the framework for a greenhouse gas emissions trading scheme for the purpose of implementing Directive 2003/87/EC of the European Parliament and the Council establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/EC (the “Emissions Trading Directive”). The Regulations apply to the United Kingdom. Regulation 2 provides for the Scottish Ministers, Department of the Environment in Northern Ireland and National Assembly for Wales to act as appropriate authority for installations situated in their area (other than installations falling within the definition of offshore installation). The Regulations control emissions of carbon dioxide from any of the activities listed in Schedule 1 to the Regulations. Part 2 of Schedule 1 sets out rules for the interpretation of Part 1 of Schedule 1. Part 1 of the Regulations (regulations 1 to 6) sets out general provisions. Regulation 2 contains definitions including designating the regulators for installations under the scheme. The other regulations in Part 1 deal with general matters such as the service of notices under the Regulations. Part 2 deals with the need for a permit to operate an installation covered by the Regulations (regulation 7), the procedure for granting permits and the contents of permits (regulations 8 to 10) and the treatment of permits once granted (regulations 14 to 18). The conditions of permits (regulation 10) must ensure that the emissions of the installation are properly monitored and reported and that the operator surrenders within 4 months of the end of each scheme year allowances equal to the annual reportable emissions from the installation during that year. Regulation 11 enables an installation in respect of which the European Commission has provided for temporary exclusion to apply for a certificate excluding it from the scheme. Regulations 14 to 17 deal with the variation, transfer, surrender and revocation of permits. Regulation 18 provides for a charge to be payable in respect of the subsistence of a permit. The subsistence charge and other charges in relation to the scheme are set out in Schedule 5. Regulation 18 provides for the provisions of the Schedule to be superseded by charging schemes adopted by the regulators. Schedule 6 provides for amendments to the Environment Act 1995 to ensure that the Environment Agency and the Scottish Environment Protection Agency are able to adopt charging schemes to supersede the charges in Schedule 5. Regulation 19 is made under section 2(1) of the Pollution Prevention and Control Act 1999 and provides for the Secretary of State to make a charging scheme for specified charges in relation to offshore installations. Schedule 6 provides for an amendment to the Pollution Prevention and Control Act 1999 to enable future regulations to extend regulation 19 to cover all the types of charge provided for in Schedule 5. Part 3 deals with the allocation of allowances. Regulation 20 requires the Secretary of State to develop a national allocation plan for each phase of the scheme and Regulation 21 provides for the Secretary of State to make a final allocation decision. Regulations 22 to 24 set the framework for the allocation of allowances to installations which obtain a permit after the national allocation plan has been submitted to the European Commission and for the treatment of installations which cease to be covered by the scheme. Regulation 26 makes provisions consequential to the Registries Regulation. Regulation 27 enables operators of certain installations to apply to form a pool. Part 4 (regulations 28 to 31) contains the enforcement powers under the Regulations. Part 5 (regulations 32 to 34) and Schedules 2 to 4 provide for appeals against decisions of the regulator and for appeals for the appropriate authority, responsible authority or the Secretary of State to reconsider decisions under the Regulations. Part 6 (regulations 35 to 37) sets out information gathering powers and publicity requirements. Part 7 (regulations 38 to 41) sets out offences for contraventions of the Regulations and civil penalties where an operator fails to surrender sufficient allowances to cover its specified emissions. Part 8 (regulations 36 and 37) enables the appropriate authority to give directions and guidance to regulators and Part 9 (regulations 44 and 45) enables the Secretary of State to give directions and guidance to the registry administrator. Part 10 (regulation 46) identifies powers under the regulations which can be exercised only with the agreement of the devolved administrations in relation to installations situated in their area (other than installations falling within the definition of offshore installations). This includes the power to develop a national allocation plan under regulation 20 and to decide upon the allocation of allowances under regulation 21. There is a default power for the Secretary of State to act where no agreement is reached if it is necessary to ensure that the United Kingdom complies with its obligations under the Emissions Trading Directive. Part 11 (regulations 47 and 48) and Schedule 6 revoke the 2003 Regulations and the 2004 Regulations subject to savings and introduce the consequential amendments. A regulatory impact assessment has been prepared and placed in the library of each House of Parliament. Copies can be obtained from National Climate Change Policy Division, Department for the Environment, Food and Rural Affairs, Ashdown House, Victoria Street, London SW1.
Read the full note and every offence in this instrument
Other offences in the same instrument
- It is an offence for a person— a to contravene regulation 7; b to fail to comply with or to contravene a…regulation 38(1)
- Civil penalties: understatement of reportable emissionsregulation 40(1)
How this was identified as an offence
Everything above rests on the judgement that this provision creates a criminal offence, rather than mentioning one. That judgement is made by rule, from the words of the provision, and this is the rule that made it — with a confidence of 0.68.
- Basis
- the provision states a penalty in older drafting
- Confidence
- 0.68 of 1.00
A provision that states a penalty for an offence created elsewhere can read very like one that creates an offence, and the rules can mistake the one for the other. If the text quoted above sets a penalty for something made an offence by another provision, treat the classification on this page with that in mind, and read the instrument.
Check the source
- This provision on legislation.gov.uk The authoritative text. Check it before relying on anything here.
- The Greenhouse Gas Emissions Trading Scheme Regulations 2005 (revoked) Every offence this instrument creates, and its explanatory note
- Health and safety, environment, waste and fisheriesOther offences on the same subject
- Offences created in 2005